Installation Made Simple
Choose Your Installation Method
Two ways to mount your LavCup. Choose the option that works best for your space.
WATCH THE INSTALLATION
METHOD 01
Adhesive installation
Follow these simple steps for a secure, clean installation.
Prepare the surface
Clean and dry the mounting area before beginning.
Mark the position
Measure carefully and mark where the mount will sit.
Apply the adhesive
Remove the backing and press the pad firmly in place.
Position the mount
Align the mount with your marks and press evenly.
Hold firmly
Apply steady pressure for about 3 minutes emphasizing pressure on different parts of the tape line. This will help it bond securely.
Allow it to set
Wait at least 24 hours applying heavy or sustained loads on the LavCup
For best results, install on a smooth, clean, dry surface.
WATCH THE INSTALLATION
METHOD 02
Screw-Mounted Installation
Secure your LavCup using the appropriate mounting hardware for your wall surface.
Select the installation location.
Position the mounting bracket.
Mark the mounting holes.
Drill the appropriate pilot holes.
Secure the mount using approved fasteners.
Attach the LavCup and check that it is secure.
Confirm the appropriate drill bit, fasteners, and anchors for the wall material before installation. Check for concealed plumbing and electrical wiring before drilling.